Purpose
Flood Control / Heavy Equipment’s main objectives are to maintain the Parish levees, maintain parish roads, clear and clean ditches, work with Army Corps of Engineers on levees, dig ditches, clear drainage pipes with a Vac Truck, and run the Empire Floodgate.
Function
The function of the Drainage Department is to operate and maintain the drainage pumping stations tasked with removing stormwater from within the levee system. The drainage pumping system of Plaquemines Parish consists of 16 major sites throughout the parish, most of which have multiple pumps.
Operators work eight hour days during the regular workweek, are on twenty-four-hour call otherwise and are responsible for monitoring both rainfall amounts and canal levels. Normally, one full-time operator is assigned to each station.
Drainage / Pump Stations
Pumping stations:
- Belair
Empire Shipyard - Belle Chasse Number 1
City Price (Hayes) - Belle Chasse Number 2
Gainard Wood - Bellevue
Wilkinson - Braithwaite
Duvic Canal - Diamond
Oakville - Ollie
Sunrise - Pointe-a-la-Hache
Pointe Celeste - Scarsdale
Bayou Grand de Laird - West Pointe-a-la-Hache
Hero Canal